Issuer Profile
Profile
K-Electric Limited (“KE” or “the Company”), originally incorporated as Karachi Electric Supply Company Limited
(KESC) in 1913 under the repealed Indian Companies Act, 1882 (now replaced by the Companies Act, 2017), is a
publicly listed entity with its shares traded on the Pakistan Stock Exchange (PSX). KE has an installed power
generation capacity of 2,397 MW through its own generation assets. In addition to in-house generation, KE has
power procurement arrangements with various Independent Power Producers (IPPs) and the Central Power
Purchasing Agency – Guaranteed (CPPA-G), has arrangement of over 1,600 MW to its power supply portfolio. The
Company’s transmission network is integrated with the national grid via interconnection with the National
Transmission and Despatch Company (NTDC). The network infrastructure includes transmission lines operating at
500kV, 220kV, 132kV, and 66kV voltage levels, 74 grid stations, and 184 power transformers, enabling efficient
transmission of electricity across its service territory.
Ownership
KES Power Limited, a company incorporated in the Cayman Islands, is the principal shareholder of KE, holding a
66.40% ownership stake. KES Power is jointly owned by the Al-Jomaih Group of the Kingdom of Saudi Arabia,
Denham Investments and KE Holdings Limited. The Government of Pakistan (GoP) retains a 24.36% shareholding
in KE, making it the second-largest stakeholder in the Company. The remaining shares are publicly traded as free
float. The involvement of the GoP as a significant shareholder, alongside the Kingdom of Saudi Arabia, contributes
positively to the overall stability of the Company. This diverse ownership structure fosters international confidence,
enhances credibility, and supports long-term strategic alignment with both domestic and regional stakeholders.
Governance
The overall control of KE vests in 13-member Board of Directors (BoD), including the CEO, where majority is
nominated by KES Power Limited (KESP), KE’s holding company. In addition to KESP’s nominees, the Board also
comprises of the directors nominated by Government of Pakistan (GoP) and an independent director. However, in
October 2022, resignation of 3 directors nominated by KESP resulted in casual vacancies on the Board which
cannot be filled by the Company as it is restricted from making change in its current Board composition in view of
the following: i)An ad-interim order of the High Court of Sindh was passed on 21 October 2022, in the suit filed by
Al Jomaih Power Limited & Denham Investments Limited against IGCF SPV 21 Limited and others whereby no
change shall be affected in the present Board of the Company. ii) A directive under section 125 of the Securities
Act, 2017 was issued by Securities and Exchange Commission of Pakistan on 08 November 2022 according to
which the composition of the current BoD of KE shall not be changed, till further orders of the Commission. Mark
Gerard Skelton was appointed as Chairman of the BoD of KE in August 2022. He currently serves as a Managing
Director in Alvarez & Marsal’s (A&M) Advisory practice based in London. With over 20 years of experience in
corporate finance and advisory, Mr. Skelton specializes in complex, cross-border assignments, navigating diverse
legal jurisdictions and various waterfall structures. Currently, the Board of KE is supported by four key committees
to ensure the effective functioning of its operations: (i) Audit, (ii) Finance, (iii) Human Resources & Remuneration,
and (iv) Board Strategy & Projects. These committees play a crucial role in streamlining the Board’s processes and
decision-making. A.F. Ferguson & Company, Chartered Accountants, is the external auditor of the Company. The
auditors have given unqualified opinion and review report on Company’s financial statements for the year ended
June 30, 2023. As the complete MYT of KE has been approved in May 2025, the financial statements for periods
beyond FY23 will be available soon.
Management
KE’s core business operations are organized into three main segments: Generation, Transmission, and Distribution.
Each segment is overseen by a well-structured hierarchy, consisting of qualified and experienced professionals.
This organizational framework ensures that the Company operates efficiently across its diverse business
functions, with dedicated expertise managing the strategic, operational, and technical aspects of each segment.
Mr. Moonis Alvi has been leading KE as Chief Executive Officer (CEO) since June 2018, steering the Company
through various phases of growth and transformation. Mr. Muhammad Aamir Ghaziani serves as the Chief Financial
Officer (CFO), overseeing the Company’s financial strategy and operations. In addition to the leadership of Mr. Alvi
and Mr. Ghaziani, KE's management team consists of a group of experienced professionals, bringing expertise to
their respective roles. The Company operates with a strong foundation built upon four core pillars: (i) Thought
Leadership, (ii) Knowledge-based Learning, (iii) Values, and (iv) Social Responsibility. These pillars guide the
Company’s operations and strategic direction. KE’s leadership is deeply committed to upholding the principles of
integrity, accountability, and continuous improvement, fostering a culture that encourages innovation and ethical
practices. The Company strives to create a harmonious balance between economic growth and environmental
sustainability, ensuring that its business activities contribute positively to society and the environment.
Business Risk
As of June 30, 2024, Pakistan’s total installed power generation capacity stood at 45,885 MW. The country’s
energy mix remains predominantly thermal-based, followed by a significant contribution from hydropower sources.
Renewable energy, while currently accounting for approximately 6% of the total installed capacity, is anticipated
to grow steadily in the coming years as the country shifts toward cleaner and more sustainable energy solutions.
During FY24, total electricity generation across the country amounted to 137,196 GWh, compared to 138,539 GWh
in FY23. KE is the only vertically integrated power utility in Pakistan, responsible for the full spectrum of electricity
generation, transmission, and distribution within its licensed territory. KE has a registered customer base of ~3.8
million at end-Mar25, of which 84.6% constitute residential consumers, 14.8% commercial, Industrial 0.6%, and
the remaining comprises of agricultural and public consumers. The MYT was submitted in four distinct segments:
Generation, Transmission, Distribution Network, and Supply. NEPRA approved the Generation tariff in October
2024, followed by the Transmission, Distribution, and Supply tariffs in May 2025. As approvals of entire MYT
recently granted, additional time is required to finalize the Company’s financial statements. KE management has
indicated that the accounts will be published soon. Profit margins are directly tied to the revenue allowances that
have been permitted by the regulator in the recently approved tariffs.
Financial Risk
KE manages its working capital requirements through a balanced approach that includes a combination of shortterm
borrowings and internally generated cash flows. To further strengthen its liquidity position, KE has finalized a
Power Purchase Agreement (PPA) with the regulatory authority. The formalization of this agreement enables KE to
offset its payables to the CPPA-G against Tariff Differential Claims (TDCs) receivable from the GoP, ensuring a
balanced net financial position. According to management, the Company’s current cash flow position and debt
profile remain comfortable and well-managed. The Company anticipates that this trend will continue, supported by
sustainable cash generation and prudent debt management practices in the future. The approval of the Investment
Plan is anticipated to result in a significant increase in debt, primarily allocated towards the expansion and
enhancement of the transmission and distribution segments. However, this is mitigated by the fact that KE has
strategically allocated funds in its Master Collection Accounts (MCA), specifically earmarked for servicing its longterm
debt, to meet its debt obligations in a timely manner.
Instrument Rating Considerations
About the Instrument
K-Electric Limited (KE) successfully issued a rated, privately placed, unsecured short-term sukuk (STS), designated PPSTS-33, on July 23, 2025, amounting to PKR 7,000 million, including a green shoe option of PKR 1,000 million. The instrument had a tenor of six months and carried a profit rate of 3M KIBOR – 0.10% per annum (i.e., 11.06% – 0.10% = 10.96%), with both principal and profit payable at maturity. The sukuk matured on January 23, 2026, and the proceeds were utilized to meet the Company’s working capital requirements. The issuance was fully subscribed.
Relative Seniority/Subordination of Instrument
Altough unsecured, in the hierarchy of creditors, the investors shall rank after the secured lenders/investors of the
Company.
Credit Enhancement
The instrument is unsecured.
|